Pre-extension House

Pre-extension House

Monday, 6 December 2010

Week 35 - Underfloor heating on and plumbing continues



Yay you can see the lines where the UFH is on and the screed is starting to dry out. There is alot of moisture in the air so we have hired a dehumidifier as the water was frozen on the inside of the windows but you can already feel a huge difference in the temperature downstairs which has gone from absolute bitter cold to quite cosy. It is going to take a week or 2 for the screed to get up to tempreture.





This is the bathroom on the top floor with the shower tray just about fitted. The plumber again did not think the drainage through so we have made a feature of having to have a raised shower tray which I will tile with mosaic tiles. Hopefully should look quite good (at least the builder came for an hour this week)

No comments:

Post a Comment