Week 28 - Some 2nd fix joinery and all the velux are finally in



EEEEEEeeeekkk 8 weeks over due and counting!

This is the view from our bedroom window which is really starting to look like a bedroom, especially with the window sill on. Elsewhere in the house the plastering continues and the more of the 2nd fix electrics. The builder however is no where to be seen!




This is the back of the house with the very last of the velux to go in on the far left which is the downstairs toilet. The velux in the lounge (2 on the right) had to be moved 3 times for one reason or another causing a massive delay and the new back doors are now in and bricked up in the lounge to match the kitchen back doors. Getting quite excited now but still feels like its a little way off internally.