Pre-extension House

Pre-extension House

Monday, 6 September 2010

Week 22 - Back lounge solid floor and 3rd floor boarding



This is a picture of the 3rd floor, the builders still need to lay the floor boards and board it but it is going to be the bathroom on the third floor and it should be big enough for a bath, shower, loo and sink. It is taking some space out of my office but I think it is worth it to have a nicer bathroom. Builder reckons there is three weeks left but I am not so optimistic :-(





This is the back lounge where we spent last 2 weekends taking up the floor boards and barrowed in around 10 tons of stone (I wish I was exaggerating but my back, arms and legs tell me i'm not). It is not quite finished yet but is nearly ready for the concrete which should be next week and then we can lay the underfloor heating. YAY!! Also the first fix electrics is nearly fully completed and the plasters did a couple of days last week so definitely getting there.

2 comments:

  1. Hii
    Very great blog! I've tried your great tips and it's very effective for me. I hope you can post more lots of information about this topic. Thank you for sharing!
    Solidfloor Black and White

    ReplyDelete
  2. Bedankt Delen Deze Poste Vele die Behulpzaam zijn Op deze Informatie

    Laminaat
    PVC Vloeren

    ReplyDelete