The insulation is layed throughout the new part of the house and a channel is dug for the new drainage system. Originally we had to have 2 inspection chambers on the inside of the house but luckily we were able to move these outside.
The stone is layed in the garage as it doesn't need insulation in preparation for the sand and visqueen.